Echo Trail
All developments
APPROVED: 3/27/19

View on Map
Case Number: 18SUBDIV1023
Location: Echo Trail
FF DRO: Yes
Location: Echo Trail
FF DRO: Yes
FF Watershed: Yes
Proposal: Build a JCPS MS in the DRO and build a 600 dwelling unit neighborhood in the watershed that flows to Floyds Fork
Proposal: Build a JCPS MS in the DRO and build a 600 dwelling unit neighborhood in the watershed that flows to Floyds Fork
Case Manager: Joel Dock
Representative: Bardenwerper, Talbott, & Roberts, PLLC
Developer: Long Run Creek Properties, LLC
Design Engineer: Mindel Scott
Owner: Long Run Creek Properties, LLC
Representative: Bardenwerper, Talbott, & Roberts, PLLC
Developer: Long Run Creek Properties, LLC
Design Engineer: Mindel Scott
Owner: Long Run Creek Properties, LLC
Environmental Concerns
- More impervious surfaces making storm water move faster to Floyds Fork
- Storm water going directly to Floyds Fork and not to retention basins
- New culvert is less than 18' and already exhibiting damage due to runoff volume
- Removal of acres of trees
- Over 100 karst terrain locations (some with diameters ranging from 30 ft to 120 ft!)
- Developer previously backed out of DRO due to environmental concerns
- Location is entirely in the DRO and needing much more protection, not less

Traffic Concerns
These are the Traffic Impact Study results for the exact same roadways. There has been no development and nothing else approved. Broad Run Rd northbound would have been a "B" in 2028 with "No Build" but the developer said the 433 dwellings will increase the wait time at the intersection by just 4 seconds. However, now, that same intersection will be an "F" in 2032 with a wait time of over 2 minutes!
Four years later and the wait time has increased by 1100%...with no new developments!
April 2022: Traffic Impact Study results from the approved Broad Run Rd (Phase 1)

December 2024: Traffic Impact Study results for the proposed Broad Run Rd (Phase 2)